1. Installation site selection
Install our blower near the septic tank.
If the pipeline is long, the sewage treatment may not perform well due to an insufficient airflow.
Install in a place which is convenient for maintenance.
Don
,
t install over a manhole or on soft ground.
Avoid areas where wind-blown leaves and dust gathers.
Install in a well ventilated place.
Install at least 30cm away from the wall of a house.
Installation in the shade is recommended to suppress heat generation of the blower.
Don
installed over the water level ot the sewage tank/aquarium to avoid any backflow of the water.
If the blower is installed under the water level a backflow valve must be used.
,
t install the blower where it will be flooded with water. Make sure that the blower is
Don
,
t install where there is excess moisture or humidity.
2. Method of Installation
The base should be made of concrete strong enough to bear the weight and block vibration from
the blower.
The base should be at least 10cm above the ground level and 5cm larger than the external
dimensions of the blower.
Provide a separate power outlet to be only used for the blower.
Electrical work must be done by a qualified electrician.
The power supply should be the rated voltage shown on the label on the blower and be fitted with
an earth leakage breaker and over-current breaker.
The power outlet used should be waterproof and include an earth connected to ground.
Place the blower horizontally on the base.
A soft rubber hose must be used for connection between the air outlet of the blower and the pipe.
The rubber hose must be fastened with hose clamps.
When making the connection, level the
air outlet and the pipe to ensure the hose is not kinked or
blocked.
Before starting the operation of the blower, ensure that the water level in the septic tank is
appropriate and the valves on the pipeline are properly opened.
3. Start operation
Insert the power plug into the power outlet with full contact so that the plug itself does not wobble.
Incomplete connection may cause an electric shock or a fire.
After starting operation ensure that there is;
No air leakage from the hose and the pipe connection.
No abnormal noise from the blower.
No vibration transmitted to the ground due to strained piping.
4
Blower
Blower
Base
Base
Water tank or Pond
Hose
Hose
Water level
Air outlet of Blower
Hose clamp
Hose clamp
Aerobic Sewage
Treatment Tank
Earth Leakage Breaker
Over Current Breaker
Waterproof Power
Outlet with grounding
Power Distribution Line
4. Installation (Septic Tank Application)
1
1
2
3
4
5
6
7
8
9
10
11
2
3
4
5
6
7
8
9
Page view 4
1 2 3 4 5 6 7 8 9 10 11 12

Comments to this Manuals

No comments